Unplanned Progress

The lines on the picture show where I was when we arrived at the ER, one of them up to the heel start, and the other about 2 inches down from there.
So first I knit the short one up to the heel marker, then put the waste yarn for both heels in, then knit the 2 rows after the heels, then changed the needle size up .25 mm.
After changing out both sets of needles I proceeded to knit up the leg of the first sock, and have it almost to the "half of the length of the foot" point, where I will change needles again, another .25mm larger. So 0 to 1/2 to 1 American sizes.
We got home

If I had been equipped with extra yarn and needles I could have had several converts last night, because the place was packed and no one was getting out of there without a 5-6 hour wait.
1 Comments:
At 1:50 PM,
Viki said…
so what did the dear child do to hurt her back? I know you asked.
Curious minds and all that.
Post a Comment
<< Home